Projects
- Sort
- Filter by service
- Project Management,
- Design,
- Workplace Strategy,
- Interior Design,
- Design and Build,
- Wellness,
- Technology,
- Architecture,
- Greenstar,
- Sustainability,
- Award Winning,
- Seismic Strengthening,
- Strategic Consultation,
- Interior Desgn,
- Delivery,
- Construction,
- Property Management,
- Filter by sector
- Commercial,
- Government,
- Residential,
- Private Education,
- Filter by location
- Auckland,
- Wellington,
- Christchurch,
- Greytown,
- Te Awamutu,
- Waikato,
- Napier,
- Masterton,
-
You only have to glance at the directory board in the lobby at 22 The Terrace to realise that you are in a very special green building. Simply put, the transformation of an existing 1980s commercial office block into an award winning sustainable 5 Greenstar showpiece has been truly efficient.22 The Terrace2022
Wellington -
This project provided unique and exciting challenges and the result is one that both Catalyst and The Department of Internal Affairs are proud of.Department of Internal Affairs
Wellington -
Pahikara is a vision for cycling tourism in GreytownPahikara Concept
Greytown -
This is a newly constructed building located in the Kaukapakapa Village, which is currently being developed by Kaukapakapa Centre Village Company Ltd.Kaukapakapa Stage 32018
Auckland -
Catalyst was engaged to design new office buildings for tenants, the Ministry of Social Development and Oranga Tamariki, in Te AwamutuMinistry of Social Development2020
Te Awamutu, Waikato -
Catalyst architecture was enlisted to upgrade and refurbish Repton House, a student dormitory at Rathkeale College in Masterton, New Zealand. The school, which is part of a group of three Trinity Schools affiliated with the Anglican Church, needed a modern living space for its male students. Repton House, in particular, required similar upgrades to those of Cranleigh House, which was previously renovated in 2009.Repton House2020
Masterton -
Rathkeale College's auditorium was closed in May 2019 due to its classification as earthquake-prone after an initial seismic assessment. Catalyst was brought on board as project managers and architects to lead the effort to reopen the auditorium as soon as possible while keeping the administration end of the building operational.Rathkeale Auditorium2021
Masterton