Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood
Crombie Lockwood

Crombie Lockwood

Wellinton

Key Project Details
SqM1500
ValueConfidential

Turning the temporary into a loved long-term workspace.

Following their displacement as a result of the 2016 Kaikoura Earthquake, Crombie Lockwood wanted to transform their “temporary” office space into their long-term workplace.

Catalyst were engaged by Crombie Lockwood to deliver full project services, including design,project management and construction
management for the duration of theproject.

Catalyst modernised the existing 1500sqm office into a modernenvironment that was in alignmentwith the firm’s nationwide standards.


Catalyst implemented collaborative workspaces and breakout areas, new lighting and floor coverings throughout as well as full bathroom upgrade and 
extension. We also created some bespoke design features and graphics to reflectthe companies brand and personality,bringing individuality into the design.


The resulting project is an effective,visually appealing workplace that supports the Crombie Lockwood team in their new home.

Like what you see?

We’d love to work with you

Enquire Now